Clear Contracts That Protect You
Many contractors work on verbal promises, raise prices halfway, or disappear. We work only on clear, written contracts. Read our actual agreements below before you pay a single rupee.
Agreed BOQ
Once you accept our quote, its BOQ (cost breakdown) goes into your contract. It only changes if we both sign a change order.
Pay After Each Stage Is Checked
You pay each installment ONLY after an engineer checks the work on site.
Right to Lab Tests
You can take steel and concrete samples for lab testing at any time.
5-Year Warranty
A written warranty for the structure and against leaks, given with the keys.
Grey Structure Construction Contract
Covers all building work from digging the foundation to the roof and plaster. It sets out when each payment is due, which material brands are used (Grade 60 steel, OPC cement, A-class bricks), and the penalty if we cause a delay.
The Builder will use ASTM A615 Grade 60 steel (Mughal/Amreli) and fresh Portland cement (Maple Leaf/Bestway). The Client has the right, at any time, to take concrete or steel samples for testing at an independent lab. If a test shows the material is not as agreed, the Builder pays for the testing.
Apart from the first advance to start work, no payment is due before the work is done. Each later payment is due ONLY after the project engineer and the Client check the finished stage on site together.
The Builder gives a 5-year written warranty on the structure, and a 3-year no-leak warranty on all roofs, underground water tanks and outside plumbing joints.
All rates in the contract BOQ (cost breakdown) stay fixed for the agreed time. The Client will not be charged extra because market prices go up, unless both sides sign a written change order.
| Stage | Stage of Work | Payment % | Work Done Before Payment |
|---|---|---|---|
| 01 | Contract Signing & Site Setup | 15% | Plot marking, site office, water boring connection, and digging machines brought to site |
| 02 | Foundation & Plinth Beam Done | 15% | Digging, anti-termite treatment, base concrete (PCC), steel cage, and plinth beam poured |
| 03 | Ground Floor Roof Poured | 20% | Ground floor brick walls, lintels over doors and windows, electrical pipe layout, and concrete roof poured |
| 04 | First Floor Roof Poured | 20% | First floor brick walls, staircase, balconies, and upper concrete roof poured |
| 05 | Mumty Roof & Water Tanks | 10% | Overhead and underground concrete water tanks with waterproofing, and the mumty roof |
| 06 | Plaster, Electrical & Plumbing Pipes | 15% | Smooth cement plaster inside and outside, pressure-tested pipes, and wires pulled through the pipes |
| 07 | Final Handover & Clean-up | 5% | Site cleared of debris, final engineer check, and warranty certificate handed over |